Logo
lv en

Results

A (preparatory) actions

C (content) actions

D (monitoring) actions

E (publicity) actions

F (project management) actions

2024

Planned

31.01.2024

Recommendations for the most optimal model of application of EPR scheme in Latvia

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

19.02.2024

Guidelines for waste sorting at construction site during demolition and new construction

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

29.02.2024

Report on IS platform launching activities and results

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

31.03.2024

Report on mapping of material flows and side-streams in the region

Responsible partner

Activity C5 "Establishment of industrial symbiosis platform for waste".

31.03.2024

Report on designed operational model (incl. financial model) for local repair and upcycling centres establishment and operations in Cēsis and Valmiera municipalities

Responsible partner

Activity C7 "Creating ecosystem for encouraging re-use, repair, and upcycling activities".

31.03.2024

Proposal for landfill repurposing model with technological and economic assessment

Responsible partner

Activity C4 "Pilot projects in regional landfills for improvement of waste sorting with aim of material and energy recovery".

30.06.2024

Report on an operational scheme for local – close to the biological waste producer – management of bio-waste based on pilot experience

Responsible partner

Activity C8 "Demonstration of solutions for reduction of biological and food waste and improving food waste measurements".

30.06.2024

Guidelines for waste management and sorting facilities

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

30.06.2024

Guidelines and recommendations for other municipalities and regions, including model and conditions for transfer of pilot project results to unified accounting and automation of all waste flows

Responsible partner

Activity C1 "Development and demonstration of a complex approach to separate waste collection system".

30.06.2024

Created CO2 reduction algorithm (report)

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

31.08.2024

Policy recommendation for application of end of waste criteria

Responsible partner

Activity C3 "Pilot projects for application of end of waste criteria to demonstrate circularity and waste to resources concept".

30.09.2024

Standardised annex to public procurement contract

Responsible partner

Activity C2 "Development of tools and piloting circularity solutions for construction process and material flows".

31.12.2024

Ziņojums par izbūvēto infrastruktūru un informēšanas aktivitātēm 2 pilotpašvaldībās tabakas izstrādājumu atkritumu piegružojuma samazināšanai

Responsible partner

C9 aktivitāte "Izglītojošas un uzvedības maiņas demonstrācijas aktivitātes atkritumu rašanās novēršanai, ilgtspējīgam patēriņam un aprites domāšanai".

31.12.2024

Regional Circular Economy Roadmap for North Vidzeme WMR with methodology for accounting greenhouse gas emissions

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2024

Guidance documents to WMRs on setting up RWMCs

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2024

Assessment report on smoker behaviours regarding tobacco consumption and littering in public places

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2024

Assessment report on efficiency of environmental tax

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2024

A comprehensive set of informative materials and communication tools for manufacturing entrepreneurs (C10)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

Done