Logo
lv en

Results

A (preparatory) actions

C (content) actions

D (monitoring) actions

E (publicity) actions

F (project management) actions

2023

Planned

31.03.2023

Information materials and campaign materials for raising public awareness about the use of the system (C1)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

31.08.2023

Analysis laboratory reports for end-product applications (the demo road section of 1 square meter, demo extrusion and compression moulding end-products)

Responsible partner

Activity C3 "Pilot projects for application of end of waste criteria to demonstrate circularity and waste to resources concept".

28.09.2023

Assessment report on environmental tax rates for non-recyclable materials

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

30.09.2023

Report from the networking events organised in Latvia (including agendas, presentations, participant list, photos) submitted along with the 1st Progress Report

Responsible partner

Activity E3 Experience exchange and networking.

30.09.2023

Report from the Baltic region thematic workshop (including agendas, presentations, participant list, photos) submitted along with the 1st Progress Report

Responsible partner

Activity E3 Experience exchange and networking.

30.09.2023

Report from study visits (agenda, content summary, signature list, photos) submitted along with the 1st Progress Report

Responsible partner

Activity E3 Experience exchange and networking.

30.09.2023

Overview report on supporting capacity building and public awareness activities implemented within Concrete implementation Actions C in the phase 1 of the Project

Responsible partner

Activity E2 Awareness raising and capacity building.

30.09.2023

Digital cooperation platform launched to facilitate reuse and repair movement

Responsible partner

C7 Creating ecosystem for encouraging re-use, repair, and upcycling activities

30.09.2023

1st Progress Report

Responsible partner

Activity F1 "Overall Project management".

31.12.2023

Strategy for Dialogue with Science

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2023

Report on pilot technology effectiveness at regional landfill “Dziļā Vāda”

Responsible partner

Activity C4 "Pilot projects in regional landfills for improvement of waste sorting with aim of material and energy recovery".

31.12.2023

Report on established infrastructure in specially protected nature territories and opening activities

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

31.12.2023

Initial monitoring report on coastal Ecosystem Services assessment on impacts on coastal areas and landfill repurposing sites

Responsible partner

Activity D2 "Monitoring of the impacts of the Project actions of ecosystem services".

31.12.2023

Initial monitoring report

Responsible partner

Activity D1 "Monitoring of the impact of the Project results and methods demonstrated"

31.12.2023

Initial monitoring report

Responsible partner

Activity D3 "Monitoring of the socio-economic impacts of the Project Actions".

31.12.2023

Guidance and informative materials on the collection and recycling of biological and food waste (C8)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

31.12.2023

Educational and informative materials for promotion of repair and upcycling model centres (C7)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

31.12.2023

Assessment report on application of the PAYT scheme

Responsible partner

Activity C6 "Enabling conditions for boosting sustainable waste management and material circularity at the national, regional and local level".

31.12.2023

Analysis and evaluation of socio-economic and environmental benefits of the implemented Phase 1 pilot projects

Responsible partner

Activity C1 "Development and demonstration of a complex approach to separate waste collection system".

Done

28.02.2023

Report of the development of the recycled building materials circulation system for the public, private and commercial sector

Responsible partner

Activity A2 "Preparatory works to create a system for circulation of recycled building materials".

a2_clean-r_report-of-the-development-of-the-recycled-building-materials-circulation-system-for-the-private-sector-(1).pdf

3.12 MB

a2_lba_report-of-the-development-of-the-recycled-building-materials-circulation-system-for-the-public-and-commercial-sector.pdf

2.79 MB

a2_lba_annex-1_report-of-the-development-of-the-recycled-building-materials-circulation-system-for-the-public-and-commercial-sector.pdf

1.24 MB

a2_lba_annex-2_report-of-the-development-of-the-recycled-building-materials-circulation-system-for-the-public-and-commercial-sector.pdf.xlsx

251.95 KB

28.02.2023

Assessment report on amounts of abandoned or to be abandoned asbestos containing waste in Latvian households, its volume to be collected, transported and disposed of in safe conditions in landfill sites where it is permitted, existing situation in Latvian municipalities

Responsible partner

Activity A1 "Preparatory works for development of a separate waste collection system".

a1_meprd_assessment-on-amounts-of-asbestos-and-potential-support-amount-for-households.pdf

3.08 MB

30.03.2023

Report on designed operational model (incl. financial model) for WEEE and ICT product repair shop and rental hub

Responsible partner

Activity C7 "Creating ecosystem for encouraging re-use, repair, and upcycling activities".

c7_eco-baltia_report-on-designed-operational-model-(incl.-financial-model)-for-weee-and-ict-product-repair-shop-and-rental-hub-.pptx

2.72 MB

30.03.2023

Monitoring plan and methodology

Responsible partner

Activity D2 "Monitoring of the impacts of the Project actions of ecosystem services".

d2.1_baltic-coasts_monitoring-plan-and-methodology.pdf

1.39 MB

30.03.2023

Monitoring plan and methodology

Responsible partner

Activity D3 "Monitoring of the socio-economic impacts of the Project Actions".

d3.1_baltic-coasts_annex_monitoring-plan-and-methodology.xlsx

245.97 KB

d3.1_baltic-coasts_monitoring-plan-and-methodology.pdf

435.35 KB

31.03.2023

Report on consumer attitude towards re-use, repair and upcycling

Responsible partner

Activity A4 "Studies of consumer behaviour towards re-use and repair".

a4_zaao_infographics_report-on-consumer-attitude-towards-re-use,-repair-and-upcycling.pdf

4.13 MB

a4_zaao_ppt_report-on-consumer-attitude-towards-re-use,-repair-and-upcycling.pdf

833.10 KB

a4_zaao_report-on-consumer-attitude-towards-re-use,-repair-and-upcycling.pdf

23.59 MB

31.05.2023

Report of A5 activities finding for regional Roadmaps

Responsible partner

Activity A5 "Preparatory works for establishment of industrial symbiosis for waste platform (IS)".

a5.5_zaao_report-of-a5-activities-finding-for-regional-roadmaps.pdf

3.06 MB

27.06.2023

Report on assessment study of smokers’ behaviour regarding tobacco consumption and littering in public places

Responsible partner

Activity C9 "Educational and behaviour change demonstration activities for waste prevention, sustainable consumption and circular thinking".

annex-c9d9_green-belt_assessment-report-on-smoker-behaviours-regarding-tobacco-consumption-and-littering-in-public-places.pdf

820.96 KB

30.06.2023

Summary of existing industrial symbiosis cases

Responsible partner

Activity A5 "Preparatory works for establishment of industrial symbiosis for waste platform (IS)".

a5.2_cleantech_summary-of-existing-industrial-symbiosis-cases-(1).pdf

2.21 MB

30.06.2023

Replicability and Transferability Strategy

Responsible partner

Activity C11 "Development and implementation of project Replicability and Transferability Strategy".

c11.1_meprd_replicability-and-transferability-strategy_25.05.2023.pdf

1.12 MB

30.06.2023

Process design of acceleration and grant scheme operating model

Responsible partner

Activity A5 "Preparatory works for establishment of industrial symbiosis for waste platform (IS)".

a5_rtu_process-design-of-acceleration-and-grant-scheme-operating-model.pdf

496.43 KB

08.08.2023

Recommendations for implementation of sorted textile collection system in whole Latvia, including development and evaluation of proposal for extended producer responsibility schemes (EPR) for textile

Responsible partner

Activity C1 "Development and demonstration of a complex approach to separate waste collection system".

annex-c1d5_annex-a1d1_green-liberty_recommendations-for-implementation-of-sorted-textile-collection-system.pdf

2.44 MB

08.08.2023

Assessment report based on life cycle analysis of different used textile product utilisation and management (recycling, upcycling, utilisation) scenarios

Responsible partner

Activity A1 "Preparatory works for development of a separate waste collection system".

annex-c1d5_annex-a1d1_green-liberty_recommendations-for-implementation-of-sorted-textile-collection-system.pdf

2.44 MB

24.08.2023

Assessment report on existing packaging flows in Latvia and action plan for data digitisation

Responsible partner

Activity A6 "Preparation for capacity building of control and data management of waste flows and extended producer responsibility systems".

a6_ses_assessment-report-on-packaging-flows-in-latvia-and-action-plan-for-data-digitalisation.pdf

3.62 MB

27.09.2023

Assessment report on existing flows of goods in Latvia and action plan for data digitisation

Responsible partner

Activity A6 "Preparation for capacity building of control and data management of waste flows and extended producer responsibility systems".

annex-a6d3_ses_assessment-report-on-existing-flows-of-goods-in-latvia-and-action-plan-for-data-digitisation.pdf

2.10 MB

31.12.2023

Handbook of steps and problem-solving regarding asbestos containing waste, available at any municipality of Latvia (C1.5)

Responsible partner

Activity E1 Project visibility and dissemination of project results.

e1_c1.5_meprd_handbookof-steps-and-problem-solving-regarding-asbestos-containing-waste_web.pdf

1.84 MB

brosura-par-azbesta-apmacibam_final.pdf

345.93 KB